Underground & Fiber Construction in Century, FL
Century sits on U.S. 29 at the Alabama state line minutes from Flomaton — where AMS's Alabama and Florida coverage meet.
From our Loxley yard
~80 min · 64 mi
Area utilities
Town of Century · Escambia River Electric Cooperative
Loxley yard → Century, AL
~80 min · 64 mi drive
Underground & fiber services in Century
Underground Fiber Installation
installing underground fiber end to end — building the pathway, then placing and pulling the fiber into it.
Underground Fiber Installation in CenturyDirectional Boring
trenchless horizontal directional drilling that installs conduit and fiber under roads, drives, and waterways without open-cutting.
Directional Boring in CenturyConduit Installation
installing the conduit, duct, and innerduct pathway that carries and protects fiber and cable underground.
Conduit Installation in CenturyTrenching
open-cut excavation for conduit, duct banks, and direct-bury utilities where an open path is the right call.
Trenching in CenturyUnderground Utility Construction
the full scope of putting utilities in the ground — boring, trenching, conduit, vaults, and cable placement, self-performed as one job.
Underground Utility Construction in CenturyWater & Sewer
underground water and sewer line installation — water mains, service lines, and sanitary or storm sewer, placed by the same crews and equipment as AMS's core underground scope.
Water & Sewer in CenturyExpanding soon in Century
Underground or fiber scope in Century?
AMS Utilities is about 80 minutes from Century, self-performing with our own crews and fleet. Call (251) 271-3502.